Ship (heavy industry) painting heating and drying facility
Ship outfitting
Outfitting
Ship block of Hyundai Heavy Industries
Power supply | 220/380/440V 1~3Ph 50/60 Hz | ||
Model name | ICE104-EWTI ( Celta standard type ) | ICE102-EWTI ( Large drying ) | ICE102-EWTI ( Large natural drying plant ) |
DRY UNIT | 30ST | 40ST | 30ST |
Power
consumption | 120Kw | 160Kw | 120Kw |
film temperature | MAX80℃ | ||
irradiation area | 10000W x 12000L | 10000W x 16000L | 10000W x 12000L |
dry (irradiation)
space | 10000W x 12000L x 3000H (360㎡) | 10000W x 16000L x 3000H (480㎡) | 10000W x 16000L x 3000H (480㎡) |
when attached
wave guard | 10000W x 12000L x 8000H (960㎡) | 10000W x 16000L x 8000H (1280㎡) | 10000W x 12000L x 8000H (960㎡) |
Dry time comparison between natural drying, hot air, and far-infrared ray drying facilities
Ship (heavy industry) painting heating and drying facility
Dry time comparison between natural drying, hot air, and far-infrared ray drying facilities
Yacht painting-heating-drying facility
CEO : Cho So-angㅣ Corporate registration No. : 606–86-20638
Location : 31 Noksansandan 362-ro, Gangseo-gu, Busan, S. Korea
Tel : +82-51-831-5071 | Fax : +82-51-831-5072
E-mail : 333tech@naver.com
Copyright ⓒ THREE TECH Co., Ltd. All Rights Reserved.