Application

Paint_powder

Powder (210℃) HSWG UNIT construction : Remodeling


KRS Plant 1 (Oct. 2017)

 Logistics warehouse material rack production plant

- Powder dry 1 LOT (W1.8M × L34M × H3M)

- Drying temperature 210℃, drying time 11 minutes (conveyor speed 3m/minute)

Powder (220°C) : New


KRS Plant 2 (Apr. 2017)

 Logistics warehouse material rack production plant

- Powder dry 1 LOT (W1.8M × L34M × H3M) 

- Drying temperature 220℃, drying time 11 minutes (conveyor speed 3m/minute)