Application

Paint_Liquid

Liquid (80℃) : New


Hyundai Rotem Plant 3 (2015/2016)

 Railway vehicle production plant

- PUTTY dry furnace 1 ST (W5.5M × L28M × H6M) , paint dry furnace 1ST (W5.5M × L28M × H6M)

- Dry temperature 60℃, dry time 60 minutes

Liquid (60℃) HSWG UNIT construction : Remodeling


Kunhwa Co., Ltd Changwon Plant (Mar. 2018)

 Heavy-duty construction machinery production plant

- Pre-heat drying furnace(W5.1M × L6.1M × H4.7M), primer dry furnace (W4.2M × L12M × H4.2M)
- Topcoat furnace (W4.2M × L24M × H4.2M), dry temperature 60℃, dry time 20 minutes

Liquid (60℃) HSWG UNIT construction : New


Shinheung Co., Ltd. (SH-PAC) (2018)

 Heavy-duty construction machinery production plant

- The dry furnace (W12M × L6M × H2M), dry temperature 60℃, dry time 60 minute

액상(60°C ~ 80°C) HSWG UNIT 시공 

 화전 공장 유압 실린더 컨베이어형 건조로

- 본 건조로 (W2.6M × L22M × H6.6M) , 건조온도 60℃ ~ 80℃ , 건조시간 23분 

디와이파워 설치 현황


중형 제품 (PT250B) 설치 현황

중형 제품 ( PT250B ) 설치 현황

- 설치일자 : 20년 5월

- 제품 : 중형 제품 실린더 (중량 : 200KG/제품당)

- 건조로 : PT250B (중형 제품 건조로)

- 건조온도 80℃ , 건조시간 60분 

대형 제품 ( PT350B ) 설치 현황

- 설치일자 : 20년 10월

- 제품 : 대형 제품 실린더  (중량 : 300KG/제품당)

- 건조로 : PT350A (대형 제품 건조로)

- 본 건조로 (2.6M(W) × 6.6M(H) × 22M(L) , 건조온도 80℃ , 건조시간 50분 

CEO : Cho So-angㅣ Corporate registration No. : 606–86-20638
Location : 31 Noksansandan 362-ro, Gangseo-gu, Busan, S. Korea
Tel : +82-51-831-5071 | Fax : +82-51-831-5072
 E-mail : 333tech@naver.com