Cases of heavy industry product installation
Installation schematic diagram (dry furnace: PT250B)
Result city gas usage meter reading
※ Of the city total gas usage, the percentage of the cost of the PT250B production line for drying furnace accounts for 29%
City gas usage
Energy cost comparison between city gas (hot air) and high-performance radiant energy
Kunhwa Co., Ltd.
Installation status
- Installation date: Installed in Apr. 2018, Applicable products : Heavy equipment parts, on condition of liquid painting drying at 60 degrees
Improvement
New investment area for dryer and expected investment costs
1. PITCH TIME per process – Prior to improvement (based on the winter season)
Improved painting time by 25%
2. PITCH TIME per process – After improvement (based on the winter season)
Drying process time improved 28%
Reduces dust by changing drying methods (29% ~ 42%)